The Cahill Road Cable Renewal Project is being completed as an essential requirement to replace the underground equipment to maintain the electricity capacity required to provide power to the River ward.
What will this project include
- Installation of of concrete encased road crossings and 2200 m of buried ducts
- Removal and replacement of 24 transformers located on impacted streets
- Excavation and replacement of underground cables located in this area
Why we are moving forward with this project
Hydro Ottawa equipment located in this area is reaching end of life. As a result, it is essential to replace this equipment to ensure the overall reliability of the electricity distribution system in the area moving forward.
Public Information Session - General FAQs
If you have questions about the project, or you would like to receive project updates, please email us at [email protected] (Community Relations)